Our business

Infrastructure Solutions

LNG Receiving Solutions

LNG Easy’s Mobile Filling Pontoon (MFP™) serves as a floating jetty.

MFP™

LNG Easy was awarded a contract in February 2020 by CNITC/VPower to install MFP in Myanmar. The MFP was prebuilt in Singapore and towed to Myanmar, 1st gas was achieved in June 2020, setting a record for LNG-to-Power project implementation.

MFP-S + Truck Filling

MFP-S is an upgrade of the MFPTM floating jetty concept, by adding a 10,000 to 20,000 cbm storage tank on top of the MFPTM, doing away with the need for a FSU to moor alongside. From MFP-S, LNG can be filled directly into ISO tank container or road tankers.

MFP-SR

If the client needs gas to shore, MFP-SR is the solution where regas skid is added to the MFP-S. MFP-SR can be understood as a mini-FSRU without the need for a jetty.

Floating Storage via Green STS™

Floating storage/breakbulking/bunkering/Gas-up-cool-down solution via Green STS.

LNG Easy has developed a way to conduct the above-mentioned operations without the BOG challenge.

Auxiliary Services

We control our STS equipment and fenders, and have qualified / certified POACs under our employ.
Our equipment and POACs are for our own projects or for third party client/projects.

Our STS equipment and operating team is part of Singapore first ever marine bunkering operation.

Coral Fucarta doing STS with CVG alongside MFP™ floating jetty

Request for animation