Our business
Infrastructure Solutions
LNG Receiving Solutions
LNG Easy’s Mobile Filling Pontoon (MFP™) serves as a floating jetty.
MFP™
LNG Easy was awarded a contract in February 2020 by CNITC/VPower to install MFP in Myanmar. The MFP was prebuilt in Singapore and towed to Myanmar, 1st gas was achieved in June 2020, setting a record for LNG-to-Power project implementation.
MFP-S + Truck Filling
MFP-S is an upgrade of the MFPTM floating jetty concept, by adding a 10,000 to 20,000 cbm storage tank on top of the MFPTM, doing away with the need for a FSU to moor alongside. From MFP-S, LNG can be filled directly into ISO tank container or road tankers.
MFP-SR
If the client needs gas to shore, MFP-SR is the solution where regas skid is added to the MFP-S. MFP-SR can be understood as a mini-FSRU without the need for a jetty.
Floating Storage via Green STS™
Floating storage/breakbulking/bunkering/Gas-up-cool-down solution via Green STS.
LNG Easy has developed a way to conduct the above-mentioned operations without the BOG challenge.
Auxiliary Services
We control our STS equipment and fenders, and have qualified / certified POACs under our employ.
Our equipment and POACs are for our own projects or for third party client/projects.
Our STS equipment and operating team is part of Singapore first ever marine bunkering operation.
Coral Fucarta doing STS with CVG alongside MFP™ floating jetty